PRICE
You get good value.
We always aim to
give top service and
quality at a fair price.
We know back-yard
operators and foreign
suppliers can offer
lower prices, but when
delivery time and
quality are considered,
are you always getting
a bargain?
With acrylic signage fabrication experience going back more than twenty five years, there is a great depth of knowledge
of what can and can’t be done and the best ways to achieve a desired result. Having dealt with the whims and fancies
of architects and designers, who seem to delight in making life difficult, we anticipate problems and will bring them to
your attention in the pre-production stage and avoid an embarrassing and sometimes expensive failure.
QUALITY
We know our work
will be seen close up.
Because you will
have the products in
your hands, our
workmanship comes
under close scrutiny.
Corners are mitred,
not butt jointed,
unavoidable butt joints
are placed where they
are least visible, light
leaks are avoided,
backs fit neatly, all
joints are reinforced
strongly and stainless
screws are used to
avoid rust marks.
ACCURACY
The end client wants
the sign to look like
what was expected.
Your digital art-
work is checked for
problems and used
to program the laser
and router. Within
the limitations of the
material, the product
is built as closely
as possible to the
specified shape. For
repetition corporate
work, cnc router cut
wooden moulds
ensure consistency of
curved shapes.
INTEGRITY
We are not your
opposition.
Because we don’t do
retail, your interests
are our interests.
We don’t design, cut
or lay vinyl letters,
digital print or any of
the usual sign work.
We don’t outsource if
we can refer you to a
direct supplier. If two
clients ask for a price
for the same job, we
will inform them.
We benefit when our
clients’ businesses are
doing well.
SPEED
More fabricators =
faster production.
Our production time
can be amazing. We
will always try to do a
job well before the due
date. Replacements
for damaged signs are
usually given highest
priorty because of the
a rapid repair has
high PR value.
Turnaround times are
affected by workload
but schedules can
sometimes be
altered to accomodate
an urgent project.
SEE WHAT CAN
HAPPEN WHEN
PRICE IS THE
ONLY FACTOR
CONSIDERED
EXPERIENCE